Biomass Energy Equipment

BIOMASS FURNACE
| Moving step grate furnace (up to 15 MW)
| Combustion chamber for pelletizing
lines (up to 7 MW)
| Standard combustion chamber
(up to 24 MW)
| Dry fuel combustion chamber
(up to 10 MW)
| Bubbling fluidized bed furnace
(up to 50 MW)
| Vibrating grate (custom size)

FUEL SUPPLY SYSTEMS
| Moving floor platforms
| Fuel layer leveller
| Scrapper conveyors
| Vibro - sieves
| Screw conveyors
| Fuel distribution systems
| Fuel sorting systems
| Grab system
| Conveyor scales for biomass

FLUE GAS TREATMENT SOLUTIONS
| Multicyclone (up to 150 mg / Nm²)
| Electrostatic precipitator (ESP) (up to 10 mg / Nm²)
| Bag filter (up to 10 mg / Nm²)
| Wet-type electrostatic filter (up to 1 mg / Nm²)
| Flue gas ducts and dampers
| Stack
| SNCR system for NOx reduction

BOILERS
| Water heating boilers
| Steam boilers
| Thermal oil boilers
| Liquid fuel boilers

EFFICIENCY EQUIPMENT
| Flue gas condensing economiser
| Dry-type economiser
| Heat pumps
| Absorption heat pump

ASH DISPOSAL SYSTEMS
| Dry ash scraper conveyor
| Wet ash scraper conveyor
| Screw transporter for ash
| Rotary dispenser
| Ash container
| Other ash disposal components

In collaboration with AXIS Tech, our team is well-equipped to offer a wide range of equipment and effective solutions tailored to the needs of biomass energy projects.
This partnership combines our strengths to ensure clients access a comprehensive selection of advanced biomass equipment, seamlessly integrated solutions and effective renewable energy technologies.
DELIVERED PROJECTS IN ACTION
2023
Lublin, Poland
50 MW bubbling fluidized bed boiler, two flue gas condensing economizers, fuel handling, ash removal, and flue gas treatment systems. Equipment start-up and adjustment.
2023
Jekabpils, Latvia
Equipment supply, installation, start-up and adjustment of 15 MW biomass water heating boiler with furnace and an electrostatic precipitator.
2023
Lomza, Poland
3.2 MWe biomass CHP: supply of fuel handling system, PKS-15 furnace, 17.0 t/h steam boiler, flue gas condensing economizer and ash removal systems. Equipment start-up/adjustment works.
2022
Daugavpils, Latvia
Construction and supervision works for the new biomass boiler house with a total capacity of 36 MW (4 x 7.5 boilers) with additional condensing economizer (2 x 3 MW).
2020
Suwalki, Poland
Construction of 30 MW biomass boiler house by installing 2 x 12.5 MW biomass water heating boilers with 5 MW flue gas condensing economizer.