Biomass Energy Projects
In collaboration with AXIS Tech, our team is well-equipped to offer a wide range of equipment and effective solutions tailored to the needs of biomass energy projects.
​
This partnership combines our strengths to ensure clients access a comprehensive selection of advanced biomass equipment, seamlessly integrated solutions and effective renewable energy technologies.
DELIVERED PROJECTS IN ACTION
2023
Lublin, Poland
50 MW bubbling fluidized bed boiler, two flue gas condensing economizers, fuel handling, ash removal, and flue gas treatment systems. Equipment start-up and adjustment.
2023
Jekabpils, Latvia
Equipment supply, installation, start-up and adjustment of 15 MW biomass water heating boiler with furnace and an electrostatic precipitator.
2023
Lomza, Poland
3.2 MWe biomass CHP: supply of fuel handling system, PKS-15 furnace, 17.0 t/h steam boiler, flue gas condensing economizer and ash removal systems. Equipment start-up/adjustment works.
2022
Daugavpils, Latvia
Construction and supervision works for the new biomass boiler house with a total capacity of 36 MW (4 x 7.5 boilers) with additional condensing economizer (2 x 3 MW).
2020
Suwalki, Poland
Construction of 30 MW biomass boiler house by installing 2 x 12.5 MW biomass water heating boilers with 5 MW flue gas condensing economizer.